Manufacturing Warehouse 2026: Factory Storage Guide
Manufacturing warehouse financing guide 2026. 0% down payment, 100% full loan. Factory storage warehouse equipment Malaysia.
What is a Manufacturing Warehouse?
A manufacturing warehouse stores raw materials and finished goods. It is part of a factory. Items go in and out all day.
In 2026, Malaysia's manufacturing sector is growing. More factories need warehouses.
Why Manufacturing Needs Warehouses
- Store raw materials
- Keep finished goods
- Manage inventory
- Ship products fast
- Organize production flow
Manufacturing vs Distribution Warehouse
| Feature | Manufacturing | Distribution |
|---|---|---|
| Main Purpose | Support production | Ship to customers |
| Items Stored | Raw materials + finished | Finished goods only |
| Forklift Type | Heavy-duty, large capacity | Standard, fast-moving |
| Racking Style | Drive-in, cantilever | Selective, push back |
| Location | Next to production line | Near highways/ports |
Bank vs Our Financing
| Feature | Bank | Ing Heng Credit |
|---|---|---|
| Down Payment | 10-20% | 0% |
| Interest Rate | 4.6-6.0% | Competitive rates |
| Financing | 90% max | 100% full loan |
| Age Limit | Max 5 years | NO age limit |
| Approval Time | 2-4 weeks | 24-48 hours |
Manufacturing Warehouse Equipment Prices 2026
Heavy-Duty Forklifts (3-5 tons):
- 3 ton diesel: RM90,000-130,000
- 5 ton diesel: RM120,000-170,000
- Electric heavy forklift: RM150,000-200,000
Drive-In Racking:
- 3 pallets deep: RM350-500 per position
- 5 pallets deep: RM400-600 per position
Cantilever Racking:
- Light duty: RM300-500 per arm
- Heavy duty: RM600-1,000 per arm
Mezzanine Floors:
- Light duty (250kg/sqm): RM80-120 per sq ft
- Heavy duty (500kg/sqm): RM120-180 per sq ft
Types of Manufacturing Warehouses
Raw Material Warehouse
Stores materials before production. Needs heavy racking for bulk items.
WIP (Work-In-Progress) Warehouse
Stores items being made. Located near production lines. Fast access needed.
Finished Goods Warehouse
Stores completed products. Organized for shipping. High turnover.
0% Down Payment Example
Scenario: Manufacturing warehouse setup RM200,000
| Cost | Bank (10% down) | Ing Heng (0% down) |
|---|---|---|
| Setup Price | RM200,000 | RM200,000 |
| Down Payment | RM20,000 | RM0 |
| Loan Amount | RM180,000 | RM200,000 |
| Cash Needed | RM20,000 | RM0 |
Manufacturing Warehouse Benefits
- Better flow: Smooth production process
- Less delays: Materials always ready
- Quality control: Proper storage conditions
- Space saving: Organized storage
- Cost efficient: Bulk buying possible
ROI Example
Before warehouse:
- Production delays due to no materials
- Cannot buy in bulk (higher cost)
- Finished goods pile up in factory
After warehouse:
- Production never stops
- Buy in bulk (save 10-15%)
- Finished goods organized and ready to ship
Savings: Higher production + bulk savings = More profit
Why Choose Ing Heng Credit?
Since 1985, we've helped 4,000+ businesses.
- 0% down payment - No cash needed
- 100% full loan - Full financing
- NO age limit - Any equipment age
- Fast approval - 24-48 hours
- Easy process - Simple documents
Set Up Your Manufacturing Warehouse Today
0% down payment. 100% full loan. Manufacturing solutions.
Contact: +60175700889 (WhatsApp) | 03-3324 8899
FAQ - Manufacturing Warehouse Financing
Q: How much down payment?
A: 0% down payment with us. Banks want 10-20%.
Q: Can I finance used manufacturing equipment?
A: Yes! NO age limit on used equipment.
Q: How fast is approval?
A: 24-48 hours. Banks take 2-4 weeks.
Q: What interest rate?
A: Competitive rates. Banks charge 4.6-6.0%.